Prefabricated Building MEP Installation Piping Production Line

Production Line Overview

Design your smart factory through innovative technical solutions

       At present, the fabrication of pipelines in large building HVAC equipment rooms and pump rooms mostly relies on on-site manual measurement and fabrication. Problems such as slow project progress, high labor costs, serious material waste, and difficult on-site management are particularly prominent. With the promotion and application of BIM technology in prefabricated buildings, centralized prefabrication of pipelines has become an irresistible trend. By integrating BIM technology with our company’s advanced hardware and software for the prefabricated equipment room piping production line, we have successfully realized “digital welding, intelligent control, information-based management, and large-scale production” for MEP installation pipelines, effectively achieving “de-welderization” and gradually moving towards an unmanned “dark factory”.

Performance Metrics

Display detailed performance of the prefabricated production line

Component Equipment

Core equipment modules of the prefabricated production line

    ※The above configuration is for reference only; the final configuration is subject to confirmation after technical discussions between both parties.

    Solution Brochure

    Showcase the overall solution for the prefabricated factory

    Download Solution Materials

    Obtain more detailed production line planning guidelines and technical parameter specifications

    Prefabricated Building MEP Installation Piping Production Line
    File type:JPG · Comprehensive solution for prefabricated factory
    Download